Client: University of Tasmania (UTAS) Stage 2
Sector: Educational Facilities
Project Size: Refurbishment of five existing buildings
Address: Lilyfield, Callan Park
Contract Value: $4.67 Million
Construction Period: 36 Weeks

Project Summary:

UTAS Stage 2 is a fit out of a Nursing and Paramedic training facility to replicate a hospital layout. It also included a lecture room with extensive AV which included; custom built lecterns, presentation equipment, air media, conferencing equipment, interactive touchscreen monitors, simulation equipment, hearing loop for hearing impaired. Joinery in UTAS Stage 2 included custom built in joinery, built in nursing lab to identically replicate a hospital environment for training, custom storage and lockers. Ample hoarding, signage, protection and care was a major consideration of the project. The staff working on the floor were impressed with the way the project was handled, keeping noise to a minimum, noisy works outside of hours, cleanliness and level of consideration that was given.